Five workers suffered injuries in a “high pressure steam line failure” at the northeast side of the Eastman Chemical Company plant which produced an explosion-like sound in Kingsport, Tennessee, Monday morning.

The steam line failure shook Kingsport at 7:30 a.m., according to a release from Eastman. The company said at 10:09 a.m. five people suffered minor injuries during the incident and received treatment from Eastman Medical or at Holston Valley Medical Center (HVMC).

Eastman also released there was no fire, and the incident is “now under control.” The steam line failure led to power outages to some portions of the site, and lockdowns followed to keep personnel in the area safe.

The company said at noon it has shut down its manufacturing operations in accordance with Eastman’s safety procedures.

Shortly after 3 p.m. spokespeople for Eastman held a briefing regarding the incident.

Schneider Bold

As the company restores power, the community could expect to see some steam venting, which may be heard throughout the surrounding community. Eastman assured the public the venting is a normal part of steam power restoration, and it does not pose a threat.

The steam line failure resulted in the “release of small particle debris that can occur with utility line disruptions,” Eastman officials said.

A media advisory released 90 minutes after the incident stated vibrations and loud noises “from a consistent heavy release of steam” were heard and felt by residents in the area.

Debris following the incident can be seen throughout the area.

A plume of steam released during a line failure at the Eastman Chemical plant.
Source: WJHL.com screen capture


Sirens at Eastman revealed three buildings ended up impacted by the incident.

Ballad Health officials said the health system had established an incident command at HVMC shortly after the incident and dispatched helicopters for the chance of major injuries.

Kingsport Fire Department (KFD) had an engine, a ladder company and a command vehicle at the scene. Eastman’s release stated its own fire department is assessing the situation with assistance from KFD.

KFD responded to Eastman at 7:45 a.m. after the company requested the fire department on standby.

Pin It on Pinterest

Share This