In addition to the blast destroying the main pipeline, the resulting concussive effects of the explosion may have damaged two other lines that run near by, according to preliminary findings released by the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA).
The blast blew 30 feet of pipeline out of the ground, resulting in a crater 50 feet long, 35 feet wide and 13 feet deep, according to PHMSA.
The Texas Eastern transmission line is owned by Spectra Energy Partners, which is owned by Enbridge Inc., based in Calgary, Canada. The entire system is 9,100-miles long, carrying natural gas from northeastern America to the Gulf Coast region.

A fire burns after an explosion near Junction City, KY, after a gas pipeline ruptured causing a massive explosion that killed one person and injured five others.
Photo: Naomi Hayes
The affected pipeline, Line 15, was built in 1942, and is a 775-mile long bi-directional system that transports gas between Kosciusko, Mississippi and Uniontown, Pennsylvania. In the area of the explosion, Line 15 is one of three parallel Texas Eastern pipelines.
PHMSA said the failure occurred at 1:24 a.m. Aug. 1. At 1:25 a.m., Enbridge’s Gas Control in Houston, Texas, received a rate of change alarm on Line 15, on the south side of the Danville Compressor Station. Then within minutes, public reports came in of a fire in the area. The report said a Danville Compressor Station operator also received the rate of change alarm and observed the rupture fire from the window of the compressor station control room.
Fire Confirmed
During the minutes that followed, other Enbridge employees confirmed the reported fire, indicating the failure of Line 15.
Personnel at the compressor station then closed the line discharge valve, located north of the failure site, according to the report. Texas Eastern field personnel responded by closing the Line 15 main block valve, then “further isolated a portion of the affected segment” and also shut down Lines 10 and 25, which it said were blocked in between the Danville Compressor Station and the Tompkinsville Compressor Station.
When the pipeline blew out of the ground, it landed approximately 460 feet from the failure site, according to the PHMSA report. Aside from the death of Lisa Derringer, 58, of Stanford, the explosion also resulted in the hospitalization of six people.
Firefighters from Lincoln County were the first to arrive on the scene, and 75 people were evacuated from Indian Camp subdivision. Both Casey and Boyle counties’ emergency services transported some injured to Ephraim McDowell Regional Medical Center, while others were self-transported.
Further Findings
Findings show the failure site pipeline consists of .375-inch wall thickness, manufactured by A.O. Smith, using flash welding, and is coated with coal tar enamel, and cathodically protected with impressed current — meaning an electrical current is used to change the environment around the metal to stop corrosion.
PHMSA said the affected segment of pipeline “contains an as-yet-to-be-determined amount of A.O. Smith-manufactured pipe of similar vintage and type to the pipe involved in the failure.” It also said the cause of the failure has not been determined, and the National Transportation Safety Board (NTSB) is conducting a metallurgical investigation to determine the exact cause.
Back on November 2, 2003, Line 15 failed at MP 501.72 near Morehead, Kentucky, between the Danville Compressor Station and the Owingsville Compressor Station to the north of the Danville Compressor Station, according to the PHMSA reprot. The 2003 failure also occurred on A.O. Smith- manufactured pipe, and resulted from interactions between hard spots and mid-wall lamination, and in PHMSA’s predecessor agency issuing a Corrective Action Order.
Texas Eastern said it performed an in-line inspection (ILl) to detect hard spots on Line 15in 2011. The company also reported that it ran an Ill with a magnetic flux leakage tool in 2018 and an Ill with a dent and inertial measurement unit tool in 2019. The2018 tool data indicated a small dent with metal loss that did not require action under federal pipeline safety regulations or TETLP’s procedures. The results of the 2019 ILl’s have not yet been provided to PHMSA.
Click here for further report details.