A fire at an offshore production facility occurred after motor-to-pump misalignment on a Lease Automatic Custody Transfer, or LACT, charge pump caused the pump to fail mechanically on a platform on the in the Gulf of Mexico.

The misalignment loosened the pump casing fasteners and allowed oil to leak onto the skid, according to an investigation by the Bureau of Safety and Environmental Enforcement (BSEE).

Platform personnel extinguished the fire using handheld fire extinguishers and a fire hose and there were no injuries in the incident.

Having said that, the incident did damage the pump, electric motor and coupling. Most of the oil remained in containment; however, an estimated 0.001 gallons of oil released into the Gulf.

As it turns out, workers replaced the electric motor and it had been in operation for 10 days at the time of the incident. Facility personnel did not observe abnormal conditions during daily rounds before the incident.

Schneider Bold
Investigation Findings

Meanwhile, the investigation found operators did not follow proper installation procedures when they installed the electric motor and coupling.

A straightedge ended up used to align the motor horizontally and vertically, but they did not perform angular alignment, according to the report. Additionally, the coupling bolts did not end up installed with the proper torque, the motor ended up installed without shims, and the motor mounting bolts did not end up torqued to proper specifications.

Disassembly and inspection of the motor confirmed the following sequence of failure: During normal operations, the motor operated at approximately 3,600 rpm. The motor-to-pump coupling misalignment, combined with the high operating speed, caused excessive vibration, according to the report.

That vibration loosened the pump casing fasteners, which allowed oil to leak from the pump casing, according to the report. The coupling eventually failed, causing additional damage to the pump and the electric motor. These failures and the associated leak led to ignition of oil on the skid.

Pump fire

Damaged Lease Automatic Custody Transfer charge pump, electric motor and coupling.
Source: BSEE


BSEE recommends operators and contractors to do the following:

  • Install equipment according to original equipment manufacturer specifications and approved maintenance procedures.
  • Ensure proper installation procedures and all required tools are available before work begins.
  • Ensure all personnel have proper training on installation procedures, proper tool use, and post-installation function checks for equipment prior to performing work.
  • Evaluate maintenance procedures to determine if post-installation surveillance of equipment needs improvement, such as increased frequency of operator rounds and/or multiple-day monitoring of equipment.
  • Investigate vibration alarms, equipment faults, and other signs of abnormal operation. Vibration alarms may end up triggered by nearby equipment if that equipment ends up mechanically connected or coupled.