The Nuclear Regulatory Commission (NRC) conducted an inspection to review the event circumstances, the procedures in place at the time, and associated documentation and the company’s immediate corrective actions.
The incident involved the loss on November 13, 2021, of a portable moisture/density gauge containing 8 millicuries of cesium-137 and 40 millicuries of americium-241. The gauge was a Troxler Model 3430. On November 13, a licensee gauge technician removed the gauge from its case and unlocked the source rod to prepare it for use at a temporary job site but failed to return it from the tailgate of a licensee pickup truck to its transportation case when the job was cancelled.
The root cause of the apparent violations was the lack of focus by the gauge technician, the report said. He became distracted by a conversation with another individual after leaving the gauge unattended on the tailgate of the vehicle. The gauge technician then left the job site in the truck to go home without securing the gauge in its transportation case. During the drive, the gauge technician noticed the tailgate was down and stopped the truck to close it but did not remember that the gauge had been left on the tailgate, and he did not realize that the gauge had fallen off.
Two days later, on November 15, 2021, when the gauge technician went to a job site and opened the gauge transport case, which was secured in the bed of the truck, he identified the gauge was missing, the report said. As corrective actions, in addition to trying to recover the gauge, the licensee suspended the gauge technician from operating a nuclear gauge and provided retraining to him and refresher training to all of the licensee’s other nuclear gauge users. The licensee also ensured that its other gauges and transportation cases were labeled with the licensee’s contact information.
Indiana’s Department of Environmental Protection (DEP) said if the gauge is mishandled or damaged then the people closest to it could end up exposed to radiation contamination.
After reviewing the company’s response to the proposed violations, the NRC concluded two violations of NRC requirements occurred involving the company’s failure to use a minimum of two independent physical barriers to secure a nuclear moisture density gauge on a vehicle when not under the direct control of a company employee; and the failure to lock the gauge when not under the direct surveillance of a company employee.