Testing Engineers & Consultants Inc. is facing a $24,000 fine for violations of Nuclear Regulatory Commission (NRC) requirements involving the loss of two moisture density gauges and the company’s radiation safety practices.

The Troy- Michigan-based company has an NRC license to use moisture density gauges containing sealed radioactive sources for measuring the properties of construction materials.

The NRC conducted an inspection that reviewed the company’s security measures to prevent the loss of regulated devices; practices for safe handling, transportation, and storage of the devices; employee safety training; and device labeling. The inspection included the review of the circumstances around the loss of two portable moisture density gauges.

After considering the company’s response to the proposed violations provided during the June 13 predecisional enforcement conference, the NRC concluded 16 violations of NRC requirements occurred.

They involved the company’s failure to ensure appropriate safety and security oversight of the gauges in such areas as maintenance, surveillance, physical control, documentation, transportation, training of personnel and staffing of a radiation safety officer as required by the NRC.

Schneider Bold

The company has taken corrective actions and is implementing further steps to address the causes of the violations.

Pin It on Pinterest

Share This