“The purpose of the inspection was to review the details of the May 28, 2021, airborne radioactivity event that resulted in multiple confirmed uptakes of radioactive materials to workers,” wrote Mary C. Muessle, Director, Division of Nuclear Materials Safety at the NRC.
Part of the NRC report discusses a preliminary White finding (i.e., “a finding with low-to-moderate safety significance that may require additional NRC inspections”), with three associated violations.
The preliminary finding and three apparent associated violations occurred on May 28 and involved the company’s failure to use appropriate radiological controls when conducting work on highly contaminated piping within the plant. As a result, two workers received unplanned exposures below regulatory limits.
“On May 28, 2021, your staff failed to implement and follow written procedures for radiation protection resulting in two uptakes of radioactive materials to workers resulting in doses greater than 700 millirem committed effective dose equivalent,” Muessle wrote in the report.
The three associated violations involve the failure to:
- Use, to the extent practicable, process or other engineering controls to control the concentration of radioactive material in air
- Control, by means of a Radiation Work Permit, the activities in a high radiation area with dose rates of greater than 1.0 rem/hour at 30 centimeters from the radiation source
- Make surveys of areas that were reasonable under the circumstances to evaluate the magnitude and extent of radiation levels and concentrations or quantities of residual radioactivity
Due to COVID-19 conditions, public participation will be via teleconference only. Meeting attendees will be able to listen to the meeting and ask questions following the business portion of the meeting by calling 800-857-5003, passcode 5204033#.
A decision on the final safety significance of the apparent violation or any NRC actions will not be made at the meeting.