Jorge Villafuerte III was checking a list of materials at the Enbridge Energy Line 3 site near Hill City while standing behind an industrial forklift when it backed over him. The 45-year-old Villafuerte died while emergency responders rushed to the site, officials said.
MN OSHA cited Eau Claire, Wisconsin-based Precision Pipeline for a serious safety violation. Under Minnesota law, companies with over 50 workers are hit with a minimum fine of $25,000 for an incident involving a fatality.
Line 3 starts in Alberta and clips a corner of North Dakota before crossing northern Minnesota en route to Enbridge’s terminal in Superior, Wisconsin. The 337-mile (542.35-kilometer) line in Minnesota is the last phase in replacing the deteriorating pipeline that was built in the 1960s.
