After holding a morning safety meeting, the crew proceeded to prepare for the demobilization.
To remove the gantry by use of a rental crane, the lift required the application of two synthetic (i.e., polyester) slings on the rental crane auxiliary line in combination with a two-part wire rope sling on the rental crane main line. The two polyester slings were tied to the bottom section of the gantry to assist with the orientation of the load, according to a report with the Bureau of Safety and Environmental Enforcement (BSEE).
With the slings compromised, the load fell approximately six feet to the deck, striking a handrail and a portion of the facility’s cable tray containing electrical wiring.
There were no injuries associated in the incident.
Multiple incident findings were identified through the operator’s formal investigation, such as there was no safe lifting plan created for the non-routine lift and management failed to make available operational procedures to the crew for the disassembly of the gantry crane.
In addition, the Job Safety Analysis (JSA) completed for the operation was a pre-completed template version that did not contain details for safely rotating the load. Also, despite personnel anticipating the weight of the load to be 9,000 pounds, the actual reading was more than 15,000 pounds once the load was set on the main block. The initial calculations failed to consider additional crane components, such as the winch, ladder, and ropes.
Another finding was personnel improperly rigged the slings using a choker configuration. This sling arrangement did not have the capacity to safely lift the original 9,000-pound anticipated weight.

With polyester slings ended up compromised, a load fell six feet to the deck, striking a handrail and a portion of the facility’s cable tray containing electrical wiring.
Source: BSEE
Add on top of that, the crane operator failed to initiate Stop Work Authority (SWA) when observing the increased recorded weight on the load cell in conjunction with the slings being utilized for the lift. The crane operator was hesitant to question the expertise of the lead mechanic.
With the findings, BSEE recommended operators and contractors consider the following:
- Develop and follow specific safe lifting plans based on the scope of crane operations (e.g., heavy lifts, blind lifts, etc.).
- Ensure applicable personnel have access to the necessary operating procedures and understand them prior to performing work.
- Confirm all communication is established and agreed upon between applicable personnel prior to commencing tasks.
- Review JSAs for high-risk operations and verifying they include job-specific instructions and associated mitigations for potential hazards.
- Incorporate an additional verification measure for confirming the accuracy of load weight calculations prior to commencing operations. Review calculations when discussing operational procedures could help to verify the information.
- Ensure slings are rigged in the most advantageous configuration to secure the load through the entirety of the lift.
- Initiate SWA and reassessing the job scope if any activity is observed to be unsafe or unforeseen, despite positional ranking, years of experience, or seniority level.