Certification of Westinghouse’s AP1000 reactor design ended up updated and renewed after the Nuclear Regulatory Commission (NRC) incorporated lessons from the construction and operation of the nation’s newest nuclear reactors, Vogtle Units 3 and 4.

The action gives future applicants a standardized, field-proven AP1000 design that reflects how the reactors actually ended up constructed and operated.

The reason for the update is to reduce duplicative regulatory reviews, lower licensing costs and help future AP1000 projects move through the NRC’s licensing process more efficiently.

During the construction and startup of Vogtle Units 3 and 4, the NRC reviewed and approved nearly 200 license amendments. To that end, by incorporating applicable design changes and lessons learned from that experience into the renewed certification, future AP1000 applicants can reference an updated design rather than seeking separate approval for changes the NRC already evaluated.

“The NRC’s approval of the updated AP1000 design provides the regulatory foundation for America to move from building individual reactors to deploying them at scale,” said Chairman Ho K. Nieh. “This is how safety-focused, enabling regulation reduces regulatory uncertainty and investment risk.”

Schneider Bold

The renewed certification extends the AP1000 design’s validity through 2066.

Future applicants must still obtain NRC approval for site-specific environmental, safety and security considerations. Furthermore, the NRC’s action does not authorize the siting, construction or operation of any facility.

Click here for the AP1000 design certification renewel.

Pin It on Pinterest

Share This