The issue at the Oak Harbor, Ohio, facility ended up identified by the Nuclear Regulatory Commission (NRC) during a special inspection conducted July 26 – Oct. 7 last year.
While reviewing the Sept. 4, 2020, failure of a diesel generator to start during testing, NRC inspectors determined the company did not ensure the installation of suitable diesel generator speed switches between Oct. 4, 2019, and July 26, 2021. NRC inspectors verified Energy Harbor took actions to ensure safe operations.
Davis-Besse will remain in the Regulatory Response column and under increased oversight until the NRC conducts independent reviews to verify Energy Harbor has fully understood the causes for both findings and has taken sufficient action to prevent recurrence.
The single-unit plant, operated by Energy Harbor Nuclear Corp., is in Oak Harbor, 21 miles east-southeast of Toledo.