One case in point is a near miss that occurred during a helicopter flight to an offshore facility that had downgraded its helideck weight capacity. This case serves as a precautionary example and underscores the critical need for effective communication and protocol compliance regarding helideck operations and conditions, according to a report from the Bureau of Safety and Environmental Enforcement (BSEE).
The pilot also confirmed the helideck’s published weight rating of 12,000 lbs. with the facility operator before departure. There appeared to be no changes to the weight rating during the standard flight planning process.
Upon arrival and prior to landing at the facility, the pilot observed a freshly painted red-hatched area and a new visible weight rating of 6,000 lbs. After verbally confirming with the platform operator over the radio a helideck downgrade had occurred, the pilot deemed it unsafe to land.
The pilot informed the flight operations center to revise the flight plan for a safe landing at a nearby facility.
This incident highlights the risks associated with delaying the publication of accurate helideck conditions. While the pilot’s alertness prevented a potential incident, the event underscores significant gaps in communication and documentation procedures.
To that end, the BSEE recommends operators and contractors consider the following:
- Ensure all helideck conditions are accurate, validated, and published, including recent updates and/or deratings, through direct communication with facility operators and the FAA
- Verbally confirm helideck weight ratings and conditions before takeoff and just prior to landing, especially for decommissioned or modified structures
- Ensure updated operational procedures to include verification with facility personnel before starting a flight to a facility of any recent helideck deratings
- Encourage crew members to voice concerns and verify information. Effective teamwork is essential for safe operations
- Anticipate the impacts of any changes to facilities, ensure all notifications, required and otherwise, are made and received promptly
- Implementing mandatory checks to confirm helideck capacities and conditions regularly
- Reinforce clear communication of helideck status changes to all personnel, ensuring updated information is accessible
- Conduct regular training sessions focused on recognizing helideck markings and their safety implications
- Update helicopter operation protocols, emphasizing the importance of pre-arrival briefings and toolbox meetings
- Implement continuous monitoring of helideck conditions and markings and updating operational protocols as needed

A delayed publication of helideck conditions can create big issues. Before flying to an offshore platform a helicopter pilot confirmed the platform could handle 12,000 pounds. Upon arrival, he observed a new sign saying it could handle 6,000 pounds.
Source: BSEE
BSEE emphasizes the importance of adhering to established safety guidelines while fostering a culture of vigilance and proactive communication. This incident reaffirms the necessity for continuous training, open communication, and rigorous verification processes to mitigate risks associated with helideck operations.
Additionally, BSEE reminds industry of the following information and aids to minimize risks to passengers, helideck crews, and others involved in offshore helideck operations:
- HSAC RP 163 Inspection, Maintenance and Operations of Offshore Helidecks.
- HSAC RP 165 Air Operator Guidelines for Offshore Helicopter Operations – 1st Edition.
- BSEE Safety Alert No. 322 / Helideck Obstructions and Compounding Procedural Errors Contribute to Five Near Misses on OCS.
- BSEE Safety Alert No.413 / Hazards Identified in Level I Surveys not Communicated to Affected Personnel.
- BSEE Safety Alert No. 479 / Lack of Adherence to Helideck Safety Procedures Results in Series of Near Miss Incidents for additional information.
- 30 CFR 250.1912 – Criteria for Safety Management System Management of Change.
- BSEE Notice to Lessees (NTL), NTL-2021-N03/Helideck Closures and Markings.
- 30 CFR 250.890 – Records. (c) You must submit to the appropriate District Manager a contact list for all facilities at least annually or when contact information is revised. The contact list must include: (6) Facility helideck rating and size.

